Integrated Scheduling

Primavera P6 schedules that connect executive decisions to Level 5 field execution.

We structure, integrate, and maintain scheduling systems that hold governance clarity at Level 1 while preserving the activity-level control needed for delivery teams.

Level 1–2 governance: executive milestone framing, phase-gate logic, and board-ready reporting views.

Level 3 integration: discipline-level logic networks, interface alignment, and critical path traceability.

Level 4–5 execution detail: crew-facing workfront planning, update discipline, and progress logic that supports recovery action.

Reporting clarity: one source of schedule truth for leadership, controls teams, and execution contractors.

Advanced Risk Analysis

Quantitative certainty for high-stakes capital decisions.

We convert uncertainty into decision-ready ranges, giving project leaders clear confidence bounds on schedule and cost outcomes.

SRA Expertise

Schedule Risk Analysis (SRA) integrating logic quality, uncertainty ranges, and probabilistic milestone forecasts.

CRA Depth

Cost Risk Analysis (CRA) linking estimate basis, contingency behavior, and exposure concentration by scenario.

SAFRAN Risk + Monte Carlo

SAFRAN Risk workflows with Monte Carlo simulation to produce defendable P-level ranges and outcome distributions.

Certified Risk Leadership

PMI-RMP-certified practitioners aligning technical rigor with executive communication and decision cadence.

Cost Engineering Coverage

From early estimate definition to live execution cost control.

Caliber Controls supports capital projects through the full cost maturity arc: Class 5 to Class 2 estimating, aligned to FEL-1 through execution controls for clearer decisions at every gate.

Estimating maturity path

Class 5  Class 2
  1. Stage 01

    Class 5

    Order-of-magnitude framing and early risk allowances.

  2. Stage 02

    Class 4

    Scope-structured estimate baseline with uncertainty logic.

  3. Stage 03

    Class 3

    Option-tested estimate with developing control account detail.

  4. Stage 04

    Class 2

    Execution-ready estimate confidence and control transition.

Project phase map

Cost control continuity from FEL-1 through execution.

  1. 1

    FEL-1

    Strategic cost envelope and key cost drivers.

  2. 2

    FEL-2

    Scope refinement with probabilistic contingency logic.

  3. 3

    FEL-3

    Control estimate preparation and execution handoff metrics.

  4. 4

    Execution cost controls

    Trend, change, and forecast governance through delivery.